We undertake the supply and installation of the Airconditioning and Mechanical Ventilation System for a new block of 5-Storey Building with Mezzanine for School of Mechanical & Aerospace Engineering in the Nanyang Technological University campus.
The ACMV System consists of one set Chiller with a total capacity of 450 refrigeration tons.
The project was completed in 2006.
|